Shower Screen Installation Sydney
Checked by a licensed glazier · 14 October 2026
When should you book the glazier?
Waterproofing goes in
Tiling finished, hob set
Screen is built
We fit and seal
Ring at waterproofing, not at the end
Tell us when your tiler finishes
- It’s free, and nothing’s locked in
- Most prices go back out the same day
- Book now, measure later — we hold the slot either way
Rather just talk? 0468 497 928, Monday to Sunday.
What you get for the price
The screen itself, cut to your opening
Every bit of hardware
Fitting and sealing
A water test while you watch
The mess leaves with us
12-month workmanship warranty
What we need ready before measuring
Tiling done and grouted
We measure off finished surfaces. Measure bare render and every number’s out by six to ten millimetres, which is enough to leave a gap you’ll notice.
Hob or base in and set
Floor running to the drain
Power and plumbing done
How much does it cost to install?
Where we install
Questions before you book
As soon as the waterproofing’s signed off. We can’t measure until the tiling’s finished, and the screen takes another three to five working days to build after that. Book early and we measure the day your tiler walks off, instead of a week later.
Usually, yes. It has to suit the opening and it has to be Grade A safety glass. Send us the model and a photo of the box. The catch with off-the-shelf screens is that they come in set sizes, and most bathrooms aren’t a set size, so there’s often a gap to deal with.
About two hours for a standard recess. Corner screens and frameless ones take longer — more fixings, heavier panels, and every join has to seal.
Twenty-four hours after we seal it. The sealant skins over within the hour, so it looks ready long before it is. Underneath it’s still soft.
Yes, that’s how the rails fix. Glass-and-tile bit, low speed, every hole plugged. If you’ve got expensive tiles, we’ll walk through the fixing points with you before anything gets drilled.