Same-day callouts across SydneyMon – Sun: 7am–6pmSend a photo quote0468 497 928

Shower Screen Installation Sydney

New bathroom? Or a shower that never had a screen on it? We measure once your tiling’s finished, build the screen to fit that exact opening, then come back and install it.

Checked by a licensed glazier · 14 October 2026

Shower Screen Installation in Sydney

When should you book the glazier?

Earlier than you’d think. This is the bit people get wrong, and it costs them a week.
1

Waterproofing goes in

Ring us here. There’s nothing to measure yet — this is just when the slot gets locked in.
2

Tiling finished, hob set

Now we measure. Twenty minutes, and those numbers are final.
3

Screen is built

Three to five working days. Meanwhile your other trades keep going.
4

We fit and seal

Two hours or so. Give it a day after that and you’re showering.

Ring at waterproofing, not at the end

Most people call once everything else is done. Trouble is, the screen still needs three to five days to build. So the bathroom just sits there while you wait on it. Make that call a fortnight earlier and the gap disappears completely.
Get a quote

Tell us when your tiler finishes

Send the room size and a photo of where the screen’s going — bare walls are fine. You’ll get a price back, and we’ll hold a measuring slot for the week you need it.
  • It’s free, and nothing’s locked in
  • Most prices go back out the same day
  • Book now, measure later — we hold the slot either way

Rather just talk? 0468 497 928, Monday to Sunday.

What you get for the price

The screen itself, cut to your opening

Framed, semi-frameless or frameless. Grade A safety glass, to AS 1288.

Every bit of hardware

Rails, hinges or rollers, the catch, the handle, the seals. You don’t buy anything separately.

Fitting and sealing

Rails plugged into the tile, glass set in, door adjusted, one clean bead of sealant.

A water test while you watch

We run it over the whole screen so you can see it holds before we pack up.

The mess leaves with us

Offcuts, packaging, old sealant. None of it ends up in your bin.

12-month workmanship warranty

That’s on our fitting. The glass and hardware carry their own maker’s cover on top.

What we need ready before measuring

Four things. If one’s missing we can still come out, but don’t treat the numbers as final.

Tiling done and grouted

We measure off finished surfaces. Measure bare render and every number’s out by six to ten millimetres, which is enough to leave a gap you’ll notice.

Hob or base in and set

Whatever the screen sits on needs to be at its final height. Swap the base afterwards and the glass no longer fits.

Floor running to the drain

If water pools where the screen lands, it’ll find a way underneath. Far easier to sort now than later.

Power and plumbing done

Nobody wants a sparky drilling next to a 10mm panel that’s already in.
Installing a Shower Rail

How much does it cost to install?

We can’t print one figure here, because every screen gets cut to your opening. Four things move the number:
Which build you go for. Framed is the cheapest, frameless the dearest. It comes down to glass thickness and what holds it up.
How big the opening is. Anything over about 2100mm tall needs two of us and suction lifters.
Straight run or a corner. A corner screen is three panels meeting at a right angle instead of two in a line.
Getting it up there. A 2100mm sheet won’t turn a tight stair landing, so sometimes we split it differently.
Send a photo and your postcode and you’ll get a range back the same day, free. Not sure which build suits the room? The replacement page puts framed, semi-frameless and frameless side by side.

Where we install

All over Sydney, beaches to the far west. Once your tiler’s off site we can usually measure the same day or the next.

Questions before you book

As soon as the waterproofing’s signed off. We can’t measure until the tiling’s finished, and the screen takes another three to five working days to build after that. Book early and we measure the day your tiler walks off, instead of a week later.

Usually, yes. It has to suit the opening and it has to be Grade A safety glass. Send us the model and a photo of the box. The catch with off-the-shelf screens is that they come in set sizes, and most bathrooms aren’t a set size, so there’s often a gap to deal with.

About two hours for a standard recess. Corner screens and frameless ones take longer — more fixings, heavier panels, and every join has to seal.

Twenty-four hours after we seal it. The sealant skins over within the hour, so it looks ready long before it is. Underneath it’s still soft.

Yes, that’s how the rails fix. Glass-and-tile bit, low speed, every hole plugged. If you’ve got expensive tiles, we’ll walk through the fixing points with you before anything gets drilled.

Get a quote
Quote now